Auto Generated UID (For Official Use Only):
25-11-25151939886
O*NET Job Zone:
Job Zone 3
O*NET Job Code:
17-3011.00
Work Days Per Week:
Monday, Tuesday, Wednesday, Thursday, Friday
Work Hours Per Week:
80
Estimated Work Hours Per Day:
8
Hourly Work Schedule Per Day:
Monday - Friday 8:00AM-5:00PM
Are Hours Per Day Flexible?:
No, hours are set.
Payment Frequency:
Bi-Weekly
Estimated Annual Salary (If value is 0, employer did not provide):
0
Opening Date of Announcement:
11/25/2025
Closing Date of Announcement:
12/16/2025
Anticipated Start Date of Employment:
02/01/2026
Anticipated Closing Date of Employment:
01/31/2027
Number of Job Openings:
3
Job Location:
Saipan
Job Location Address:
San Antonio, Beach Road
FLSA Covered?:
Yes
DOD or VEVRAA Related?:
No
Overtime Available?:
Not Available
Payroll Deductions:
Federal Income Tax, State Income Tax, Social Security (FICA), Medicare Tax, Other Payroll Withholdings
Job Qualification Requirements:
MINIMUM ASSOCIATE'S DEGREE REQUIRED. KNOWLEDGE OF DESIGN TECHNIQUES, TOOLS, AND PRINCIPLES INVOLVED IN PRODUCTION OF PRECISION TECHNICAL PLANS, BLUEPRINTS, DRAWINGS, AND MODELS. KNOWLEDGE OF MATERIALS, METHODS, AND THE TOOLS INVOLVED IN THE CONSTRUCTION OR REPAIR OF HOUSES, BUILDINGS, OR OTHER STRUCTURES SUCH AS HIGHWAYS AND ROADS. 2 YEARS OF DIRECT WORK WITH AUTOCAD AND CONSTRUCTION DRAWING PREPARATION.
Additional Job Information: Benefits, Required Tools, Supplies, etc.:
Employer name: Freddie Zamora Cataluna, C Pacific Corporation dba Five Star Builders
Employer Contact Info: +16702336927 | hr@cpacificcorp.com
This job opportunity is a temporary, full-time position.
Job Title: Civil Designer
Total Number of Job Openings: 3
Work Experience (number of months required): 24 months
Place of Employment: Beach Road San Antonio Village, Saipan, Northern Mariana Islands, 96950
Basic Wage Rate Paid: $17.02/hour
Overtime Wage Rate Paid: N/A
Payment Frequency: Bi-Weekly
Deductions from Pay:
All applicable taxes, such as:
Chapter 2 Tax: Wage and Salary Tax (WST)
Chapter 7 Tax: Northern Mariana Territorial Income Tax (NMTIT)
FICA - Social Security and Medicare Taxes
Deductions will be made as required by law.
Three-Fourths Guarantee: Workers will be offered employment for a total number of work hours equal to at least three
fourths of the workdays of the total period that begins with the first workday after the arrival of the worker at the place
of employment or the advertised contractual first date of need, whichever is later, and ends on the expiration date specified in the work contract or in its extensions, if any.
Transportation and Subsistence: If the worker completes 50 percent of the work contract period, the employer will
provide, reimburse, or advance payment for the worker’s transportation and subsistence from the place of recruitment to
the place of work. Upon completion of the work contract or where the worker is dismissed earlier, the employer will
provide or pay for the worker’s reasonable costs of return transportation and subsistence back home or to the place the
worker originally departed to work, except where the worker will not return due to subsequent employment with
another employer or where the employer has appropriately reported a worker’s voluntary abandonment of employment. The
amount of transportation payment or reimbursement will be equal to the most economical and reasonable common carrier for the distances involved.
Daily Transportation: N/A
Overtime Available: No
On-the-Job Training Available: N/A
Employer-Provided Tools and Equipment: Yes
Workers will be provided, without charge or deposit
charge, all tools, supplies, and equipment required to perform the duties assigned.
Board, Lodging, or Other Facilities: N/A
Recruitment Info:
A Job Vacancy Announcement will be posted on the CNMI Department of Labor website to invite applicants. The announcement will remain posted for the duration required by the CNMI DOL to allow sufficient time for applications. Resumes will be screened to determine if applicants meet the necessary qualifications. Only those who pass the resume screening process will be contacted for further steps. Successful applicants will be contacted via email and/or telephone to schedule interviews and verify employment details. Interviews will be conducted at our
office during the following times: Monday to Friday, 8 AM to 12 PM and 1 PM to 5 PM. Applicants may also reach us by calling 670-233-6927 or emailing hr@cpacificcorp.com. A document will be maintained to record events, evaluations of resumes/interviews, and applicant contacts to comply with recruitment standard.
Job Posting Type:
New
Visa Type:
CW-1
H-1A/H-2A/H-2B Related?:
Not Applicable
Staff Notes (For Official Use Only):
Confirmed by DC. 11/25/2025
PREPARE DRAWINGS AND TOPOGRAPHICAL AND RELIEF MAPS USED IN CIVIL ENGINEERING PROJECTS, SUCH AS HIGHWAYS, BRIDGES, PIPELINES, FLOOD CONTROL. PROJECTS, AND WATER AND SEWERAGE CONTROL SYSTEMS. PRODUCE DRAWINGS, USING COMPUTER-ASSISTED DRAFTING SYSTEMS (CAD) OR DRAFTING MACHINES. DRAFT PLANS AND DETAILED DRAWINGS FOR STRUCTURES, INSTALLATIONS, AND CONSTRUCTION PROJECTS, SUCH AS HIGHWAYS, SEWAGE DISPOSAL SYSTEMS, AND DIKES, WORKING FROM SKETCHES OR NOTES. REVIEW ROUGH SKETCHES, DRAWINGS, SPECIFICATIONS, AND OTHER ENGINEERING DATA RECEIVED FROM CIVIL ENGINEERS TO ENSURE THAT THEY CONFORM TO DESIGN CONCEPTS. DRAW MAPS, DIAGRAMS, AND PROFILES, USING CROSS-SECTIONS AND SURVEYS, TO REPRESENT ELEVATIONS, TOPOGRAPHICAL CONTOURS, SUBSURFACE FORMATIONS, AND STRUCTURES. DETERMINE THE ORDER OF WORK AND METHOD OF PRESENTATION, SUCH AS ORTHOGRAPHIC OR ISOMETRIC DRAWING. FINISH AND DUPLICATE DRAWINGS AND DOCUMENTATION PACKAGES ACCORDING TO REQUIRED MEDIUMS AND SPECIFICATIONS FOR REPRODUCTION, USING BLUEPRINTING, PHOTOGRAPHY, OR OTHER DUPLICATING METHODS. CORRELATE, INTERPRET, AND MODIFY DATA OBTAINED FROM TOPOGRAPHICAL SURVEYS, WELL LOGS, AND GEOPHYSICAL PROSPECTING REPORTS. SUPERVISE OR CONDUCT FIELD SURVEYS, INSPECTIONS, OR TECHNICAL INVESTIGATIONS TO OBTAIN DATA REQUIRED TO REVISE CONSTRUCTION DRAWINGS. EXPLAIN DRAWINGS TO PRODUCTION OR CONSTRUCTION TEAMS AND PROVIDE ADJUSTMENTS AS NECESSARY. DETERMINE QUALITY, COST, STRENGTH, AND QUANTITY OF REQUIRED MATERIALS, AND ENTER FIGURES ON MATERIALS LISTS. LOCATE AND IDENTIFY SYMBOLS ON TOPOGRAPHICAL SURVEYS TO DENOTE GEOLOGICAL AND GEOPHYSICAL FORMATIONS OR OIL FIELD INSTALLATIONS. CALCULATE EXCAVATION TONNAGE AND PREPARE GRAPHS AND FILL-HAULING DIAGRAMS FOR USE IN EARTH-MOVING OPERATIONS. CALCULATE WEIGHTS, VOLUMES, AND STRESS FACTORS AND THEIR IMPLICATIONS FOR TECHNICAL ASPECTS OF DESIGNS. PLOT CHARACTERISTICS OF BOREHOLES FOR OIL AND GAS WELLS FROM PHOTOGRAPHIC SUBSURFACE SURVEY RECORDINGS AND OTHER DATA, REPRESENTING DEPTH, DEGREE, AND DIRECTION OF INCLINATION